Industrial method and control for SMEs that want more margin.

We apply factory, quality and construction best practices to give you real cost visibility, waste-free processes and data-driven decisions - in weeks, not months.

Clear cost and margin
90-day action plan
Ready-to-use templates

Three specialities, one goal: your result.

Our strength comes from the synergy between industrial method, quality rigour and construction control.

Industry Quality Construction e2b Measurable Results

Industry & Processes

We apply efficiency and continuous improvement methods to optimise your operations, cut costs and eliminate waste.

Quality & Compliance

We help you standardise and meet the regulations (ISO, GxP) your customers demand, without unnecessary bureaucracy.

Architecture & Construction

We bring economic and management control to your works and projects, ensuring profitability and on-time delivery.

Our Lines of Action

Four complementary focuses to improve with method. Pick where to start and get tangible results.

Industrial Method & Digitalisation

Ideal for:

Production SMEs, workshops, builders and services looking for control and efficiency.

What it solves:

  • No visibility of real profitability.
  • Decisions without data.
  • Manual processes with errors.

Vivienda 5.0

Ideal for:

Homeowners or renovators looking for efficiency, comfort and self-generation.

What it solves:

  • Uncontrolled energy consumption.
  • Lack of home-automation integration.
  • Projects without measured return.

Related solutions:

▶️ Kit: Energy Check Pack

Practical kits with industrial DNA.

Results in days, not months. Ideal for those who want better control without complex software or expensive consultants.

Prefer to do it with us?

We help you with method, data and real experience. No empty reports or technical jargon, just results.

Deliverables: 90/180-day plan, action board, KPIs and support.

COMING SOON

Practical Training for your Team.

We are preparing courses and workshops to train your team in continuous improvement, cost control and quality management. Real tools, applied to your day to day.

From our Blog

Practical guides to measure better, decide with data and execute with method. (Articles in Spanish for now.)

Real results, measurable impact

We apply the same method in factory, workshop or site. These are some transformation examples.

Local Builder

+12%

Margin Increase

We implemented the Budget Control Pack and a weekly board to stop overruns and control real margin per project in just 3 months.

See related Kit

Mechanical Workshop

-40%

Stock Errors

With the Audit Smart Kit and basic warehouse standardisation, we eliminated stops due to missing critical components.

See related Kit

Components Factory

+15%

Efficiency (OEE)

An OEE Diagnostic with no MES needed and a 90-day plan increased availability and cut unplanned stops.

See Service

Energy Company

-28%

Electricity Consumption

The Energy Check Pack identified and prioritised low-cost measures with high direct impact on the energy bill.

See related Kit

Indicative results based on real cases; final impact may vary per project.

How do you want to start

Kits

Download and use it today.

€

  • Excel + Guide + Dashboard
  • Free demo

RECOMMENDED

Express Diagnostic

90-day plan in 3 working sessions.

€€

  • Sessions with your team
  • 90/180-day roadmap
  • KPIs and quick wins

90/180 Projects

Full implementation and follow-up.

€€€

  • Implementation and training
  • Monthly KPI review
  • Scaling and standardisation

One team, three complementary visions.

Our strength is the union of process engineering, architecture vision and quality rigour. We translate complexity into solutions that work.

Avatar of Javier M. González Photo coming soon

Javier M. González

Engineering & Processes

Over 10 years improving operations in energy, pharma and aero industrial plants. He brings the method, the data and the efficiency focus so every solution is measurable and scalable.

LinkedIn

Avatar of Mauricio Núñez Photo coming soon

Mauricio Núñez

Architecture & Construction

Experience executing projects and works. He ensures the tools are practical, visual and fit the reality of the sector.

Avatar of Amalia Martín Photo coming soon

Amalia Martín

Quality & Audits

Specialist in regulations and management systems. She guarantees every kit and every process meets the most demanding quality standards.

Frequently asked questions

Do I need special software?

No. All our resources work with standard tools (Excel, Notion, HTML). If you already have your own systems, we integrate with them easily.

Can I adapt the materials to my company?

Yes. Everything is designed to be easily customised with your logo, data and processes. You are not tied to closed software or licences.

Is support or coaching included?

Yes. All kits include a step-by-step guide, and you can extend with mentoring sessions or 90/180-day projects.

What is the difference between kits and projects?

Kits are self-applied and ready to use immediately. Projects involve personalised coaching, KPI tracking and measurable results.

How long until I see results?

With kits: first improvements in 1-2 weeks. With projects: fortnightly milestones with KPIs.

Pricing and way of working?

Kits: fixed price. Coaching: 90/180-day pack with defined scope and deliverables.

Shall we talk about your project?

Tell us what you want to measure or control and your timeline. We propose a 30-min session to frame the case and, if it fits, we send you a 90-day mini-plan with deliverables and price.

We run on-site and remote projects with teams in English and Spanish. We have delivered projects in Madrid, Seville, Cádiz, Algeciras, Talavera de la Reina, among others.

Email us at proyectos@e2building.com or fill in the form and we will reply within 48 hours.