90-Day Plan + Action Board
Annual plans die in February. This is a 90-day sprint with one goal, one KPI and a board that gets looked at every week - built for the shop floor, not for slide decks.
What you get
→ 90-day plan on one sheet
Quarter goal, KPI, baseline and target. The 3 phases (Quick Wins, Consolidate, Scale) calculate their own % progress.
→ Impact-effort matrix
Score each possible action from 1 to 5 and the classification comes out by itself: Quick Win, Major Project, Filler or Money Pit.
→ Action board
One owner per action, statuses and an automatic warning if you have more than 3 things in progress at once.
→ 13-week tracking
One line per week: what got done, what's blocked and what was decided. The 15-minute stand-up meeting.
→ PDF guide (4 pages)
Why 90 days, how to prepare the kick-off and the mistakes that kill sprints. In English and Spanish.
→ Pre-filled example
A sample factory plan with an example target (cut unplanned downtime by 20%, not an achieved result) so you can see how it works before you start.
Single bilingual file: headers and instructions in Spanish and English. Calculation cells are locked so nobody breaks the formulas; you only type in the input cells.
What it looks like inside



How it works
- Define ONE quarter goal and its KPI (the one that hurts, not the one that looks nice).
- Dump every possible action into the impact-effort matrix and start with the Quick Wins.
- Review the board each week with the action owners; allow enough time for the outstanding issues.
- At the end of month 1, consolidate what worked; at the end of month 3, scale it to the rest of the plant.
To support follow-up, limit work in progress, assign an owner to each action and set a weekly review. The template helps record that routine; it does not guarantee delivery of the plan.
Who it's for
For the plant, production or continuous improvement manager of an industrial SME who wants to execute a quarter with focus, without building a PMO or buying project management software.