Energy Savings in Your SME: 30-Day Quick Wins

Here is a 4-week action plan with low-cost, high-impact measures so you can start cutting your electricity bill right away.

Quick Savings Calculator

Move the sliders and see the annual savings potential of 3 simple actions.

Annual Savings Potential

€0

Lighting: €0

Standby: €0

Compressed air: €0

Estimate based on average assumptions (e.g. 8h/day, 250 days/year, €0.22/kWh). Real savings may vary.

Energy cost is one of the biggest headaches for any SME. As you have seen, small actions can add up to meaningful savings. Browse our 30-day plan to see how, step by step.

Week 1: Diagnosis and Easy Wins

Before acting, you need to understand. This week we focus on finding the most obvious and cost-effective energy "leaks".

Analyze Your Load Curve

Ask your electricity retailer for it. It will reveal phantom consumption at night and power peaks you can optimize.

Hunt Down Compressed Air Leaks

Compressed air leaks can be costly. Inspect, measure and work out the cost from the pressure and running hours of your system. Listen and seal!

Key Takeaways

  • Analyze before acting: Your load curve is the treasure map for finding the biggest savings.
  • Go after the "big consumers": Compressed air and HVAC are usually the areas with the most quick-savings potential.
  • Preventive maintenance is energy savings: A well-maintained machine is an efficient machine.