Quick summary
- Problem: installing a heat pump or solar PV without thinking about the whole system leads to expensive, inefficient setups.
- Approach: design the ecosystem as a "combined team": generation, machine and brain.
- What you get: a quick configurator that suggests the ideal pack for your case.
- Time: 8-10 min read + 3 min tryout.
1) What a well-designed active ecosystem is
It's not "just put up panels". It's making three pieces work in your favor:
- Generation (PV): Produces cheap energy when the sun shines.
- Heat pump: Turns kWh into heat/cooling efficiently.
- Control (DHW): Decides when to heat water (schedules, sun, tariffs).
2) Decisions that change the outcome
The Solar Side
- Sizing: excess power without daytime consumption = cheap exported energy.
- Orientation: south gives the maximum annual yield; east/west can fit real use better.
- Management: use surplus to pre-heat DHW.
The Heat Pump Side
- Emitters: underfloor heating > low-temp radiators > old radiators.
- DHW tank: key to storing thermal solar energy.
- Control: load priorities and weather-compensation curves.
3) Steps to define your ecosystem
- Sketch your current situation: Equipment, age, consumption.
- Analyze usage: Are you home during the day?
- Define your goal: Pure savings or full comfort?
- Choose a strategy: All at once or in phases?
- Check incentives: They can determine the order.
Ecosystem Configurator
Answer 3 questions and we'll suggest the pack that fits you best.
Recommended Pack
Savings Potential
Complexity
Set up your home to see the result. Preloaded values are examples.
Illustrative example: a detached home moving from "expensive gas" to an ecosystem
Imagine a detached house with an old gas boiler and radiators, and a family at home in the evenings.
Decision: first phase of solar PV and smart DHW taking advantage of the sun; second heat-pump phase after improving insulation.
Outcome to verify: simulate the savings and investment with real consumption, tariffs, quotes and installation work; don't assume a lower bill or zero construction work.
2-week mini plan
Week 1: Assessment
- List current equipment and bills.
- Use this article's configurator.
- Define your main goal (savings/comfort).
Week 2: Design
- Sketch your "target pack".
- Ask for 2-3 comparable quotes.
- Choose the installer for their technical approach, not just price.