Why do you need a UNS?
Because every department keeps its data somewhere different and nobody trusts anyone else's numbers. A UNS creates a common structure where everyone (machines and people) speaks the same language.
UNS explained for SMEs
Unified Namespace (UNS) is, put simply, a way of organizing and exposing your industrial data as if it were a single logical folder, where everyone knows:
- What every machine, line or customer is called (naming standard).
- Which variables it publishes (status, production, alarms).
- Where to read that data in real time.
Important: it is not a specific piece of software, it is an architecture. You can start designing it on paper before buying anything.
Connect your Factory
Click the blocks on the left to connect them and see the impact.
Data Sources
Machine / Sensor
Raw data (PLC, IoT)
Line / Process
Context (Order, Shift)
Business / ERP
Money, Customers, Deadlines
Real-Time Diagnosis
Disconnected Silos
Your data lives on separate islands. Nobody has the full picture. Click the nodes on the left to start.
How to get started without getting lost in the tech
Draw your Tree
On a whiteboard. Define the hierarchy: Company / Plant / Area / Line / Machine. Name everything.
Pick 5 key data points
Don't try to connect 500 signals. Start with: Status (running/stopped), Good Parts, Scrap Parts, Speed and Active Order.